Facia being fitted.
In this photo the posts are cemented in the ground and securely fixed to the frame with the decking bords being cut to size and placed on top before fixing.
In this photo i have just put a membrain underneath the timber frame which prevents weeds from growing through and allows water to pass through.
Here im finishing the supporting noggings that sit between each joist to prevent any twist and reduce the movement creating an overall stronger stucture
In the first picture the treated timber has been framed togeather.
No comments:
Post a Comment